Thursday, 2 October 2014

Hog Bristle Half Render

It has definitely been a monumental day today. Our coloured render has started!! I've said before that I have been a little nervous about our colour choices on the facade. They were one area that we weren't 100% sure about when we went through our colour selection and took on the guidance of the colour consultant. Render sample look so different to colour swatches too. So I have been looking at our colour swatches lately with a hit of hesitation. So whcen I went past today and saw the colour I was so excited! It's great! We wanted a nice sandy colour without being too white and it's just that. The main render is Dulux Hog Bristle Half. Our second render colour is Dulux Bedbox - which will be part of the small piers and beam - they have done a minor part of this colour today too and it's great to see them together. Feeling so happy and proud of our baby; Nelson!!! Facade colours are a HUGE choice - it's not something you can hide and its not a cheap option to change either. 

Render - Dulux Hog Bristle Half

The render on the small beam under the portico is
- Dulux Bedbox

Dulux Bedbox render on the beams (far pier will also be this colour render - brick pier will be tiles)


Close up of colours together - (not finished)
Garage hasn't been done yet! - It will also be Dulux Hog Bristle Half

Side of House

Looking Forward to Tomorrow!

Garage door was also painted - Hog Bristle Half 
We had this door extended to 920mm so you could get through with a wheelbarrow a little more comfortably without skinning your knuckles!!

Alfresco Beams Painted - Dulux Hog Bristle Half
It's amazing how much more 'finished' this area feels, being painted.  


Metre Box Painted - Woodland Grey
(Not sure why they don't just supply the metre cox in the colourbond colour you pick - it will no doubt chip a bit being a metal opening door - every build seems to be the same - standard Jasper when delivered)

Drainage Pipes Painted - Woodland Grey
Didn't expect these to be done - nice touch Carlisle!!

Sneak Peak at the Stairs!!!
There will definitely be more photos to come when I can sneak in - (tomorrow!!) 

Bath Must be In!!

I wasn't sure I was looking in the right house at first as the kitchen bench actually looked a little clean - I had to do a double take - what a special day today is!!! 






Sunday, 28 September 2014

3 Steps Forward, 2 Steps Back.

At the moment if feels like we are taking a few steps forward, only to find other things that need to be done or followed up that takes us backwards! Last week was a really quiet week. Most of what our SS told us would be done, wasn't and things that have been done have either only half been done or are now affecting other things that need to be done.

Termite Protection is now Complete! 
Tick that one off the list!

On Friday the plumbers were there connecting all the downpipes to the drainage points. This is great, except that the downpipes on the facade and sides have yet to have the coloured render applied....... The downpipes were lengthened earlier in the week and they thoughtfully only tacked the brackets onto these areas as it was obvious they would need to be taken off. A week goes by (without renderers) and they need to connect them into the pipework below and now they seem somewhat permanent... Wonder what will happen here (they will be coming off!!!) 


It's great to have the downpipes on so that the rain isn't pooling around the sides of the house. They were put on just in time for the warm weather!

Lots of pipes and unknown drainage points!

This one is out the front and has a different capping to the others - sure to find out more during the week.

This point looks like drainage to clear off excess surface water. It is oh so close to where the concrete for the driveway will be. Maybe you concrete it in to the area to help runoff? 

You can see it's position on the edge of the crossover

The painters were there today. When we went past they were staining the trim (architrave) of the front doors. We thought the stairs may also have been done (as our SS said it may be done last week). The front door architraves were done, but not the actual doors, the alfreco ceiling was painted, but not the small eves at the side of the alfresco, the garage wall that was re-plastered was painted, but not the walls inside that had been patched..... 2 steps forward, 1 step back..... 

Alfresco Ceiling

Garage Wall Painted

Garage Eave Painted

Upstairs Bath Delivered (sitting in the study here)

Tapware on Ensuite Spa Bath
except it's the wrong spout.... (It actually hasn't been connected properly so we think they are aware this is the wrong one.  

I took this photo today because I absolutely love these doors! Sometimes you don't want to lose sight of the amazing things by getting bogged down in the things that no doubt will work themselves out in the end! Looking forward to many dinner parties looking through these babies!! 



Tuesday, 23 September 2014

Ticking off the List

It was really kind of the workers to leave the windows and doors open last night....... One positive was that we got to see what had been happening over the past few days! Unfortunately I only had my phone on me which is clearly in desperate need of an update due to the poor photo quality! 

My Legs Feel Feeble Looking at this Bad Boy!
It's a GREAT standard feature of Carlisle (Affinity) Homes


Glass of Wine, Trashy Magazine and a Spa - what more could a woman want!! 

Plastering Around the Window Fixed (from when the window was dropped)


More Electrical Work Finished
Double fluorescence to garage and more lights completed (still more to be done)

Door Handles On - Internal Doors = Elena Lever (Cat 1) - Bright Chrome


Elena Lever with Privacy Adaptor (upgrade)

Angular Trilock - Bright Chrome (upgrade)

Water Proofing Around Basins and Bottom Ledge of Tiles (still more to go - some tiles to still grout)

Some Down-Pipes Added 
(not connected to drainage and facade not done due to rendering)