Showing posts with label Downlights. Show all posts
Showing posts with label Downlights. Show all posts

Tuesday, 30 September 2014

Lights, Camera, Action - Electrical Light Up!!

Photo overload today!! Yesterday when we went past we were lucky enough to get inside as one of the doors had been left unlocked. We made the most of the opportunity! As well as taking lots of photos and having the freedom to have a careful look around, the main reason I wanted to get inside this week was to give the floors a good clean. The carpet will be close to going down and the floors are sooooooo dusty and dirty. You would assume that the floors would be vacuumed cleaned beforehand but I honestly don't trust they would be. The painters had swept the dirt away from the bottom of the staircase but it all sat 30cm away and would surely end up all through the house again. I actually took our old vacuum and started upstairs. It was quite a scene. Within 3 minutes of vacuuming the dust was pouring out the end of the vacuum and the room was thick of dust - I opened every window in a mad panic as it looked like smoke and the last thing I needed was the fire brigade turning up to a dust storm!! So instead, I attacked it all with a broom, brush and shovel. It was much cleaner (took a lot longer) and I opened the back and front doors which limited any dust. It's spotless now! By the time I finished sweeping, darkness had crept in. So I tested out all the lights! It was definitely a goose-bump moment!! It looks like a real house, like a house you would really live in!!! We were really surprised with the brightness of the downlights too. We had excepted that we may need to change most of the globes over to brighter ones once we moved in but they are great!! The photos don't really show the true effect of them - in real life is even better!  

Looking Through the Front Doors

Down the Hall (forgot to turn the bulkhead lights on)
(Dust Free Floors!!)

Stair Lights (with hall lights on)

Stair Lights Only - LOVE THESE!


Study - this room is super bright

Theatre Room

Downstairs Powder Room

Ensuite


Looking the Other Way Down the Hall

Kitchen - only had these ones on for a split second as even the dangling ones were working!
Clean Floors!!

Lounge Room

Laundry

Upstairs Activity Room

Upstairs Bathroom 

Upstairs Powder Room

Wednesday, 3 September 2014

Electrical Work!!

The electricians have been hard at work this week. They have spent the past 3 days at the house and will still need to come back when some of the products they need arrive. Doing a happy dance for nearly all of the work but a couple of small disappointments. These have come through being first time builders; aka novices (always bound to make mistakes - tough realisation for perfectionists!!). Our mistakes are things we overlooked unfortunately. Small things but grrrrrrrrrrrr!! Focus on the positives!!

Electrical Work Completed:
Down-lights installed - still some to go;
Exhausts to showers and toilets;
Stair lights;
Batten points for lighting and ceiling fans after handover;
Power-points and light switches installed - some changed to be made;
TV and Foxtel points installed
Outdoor powerpoints and junction boxes
20amp isolator switches for reverse cycle air conditioners (installed after handover)
Central heating installed; and
Kitchen range started.
Downlights in entry bulkhead


Master Bedroom Batten Points
Centre point for ceiling fan and left and right for pendant lights (to be installed post handover)

These are our master bedroom pendants. They are timber, with chain and rope. 
Bergen Wood Pendants - Schots Home Emorium

Slimline Light Switches and Master Bedroom Powerpoints

Stair Lights
(The electrician told me they had trouble placing these as the timber from the stairs had obstructed their position)

Spotted these lights on 'The Block Glasshouse' last night!

Electrocution anyone??!!

Lounge Lights - we thought we would try and start a new fad - downlight pendants!!
(I am joking!)

Dining Downlights and Batten Points for Kitchen Island Pendants
(Don't you love the shades!)

Kitchen Island Pendants (to be installed post handover)


Dimmer for Lounge 
(electricians said this is the incorrect plate and will replace next week
 - not sure why)

Yes, please do!

Really disappointing to see the placement of the air vent for the central heating. It's in the hallway towards the theatre room. We made specific note of the location of this in the display. It was tucked around the corner IN the theatre. We thought this was great as it's not the prettiest of things. Assumed this was it's standard placement... As they say in building (or in fact anything in life), never assume....... So we are taking a positive from a negative and are thinking it terms of noise it probably is a better place. Still slightly peeved though! We need to check our unit too as we upgraded to a more powerful one to include zoning - added to the 'checking' list.

Square Vents Downstairs


Round Upstairs!

Bit of Paint Patching to do

Preparation for garage door and batten points are for 2 x double fluorescent lights which will be put in next week 




This was another small disappointment. I took this photo for the downlights and then wondered why on earth the powerpoints were so high. I checked the plans and yes, they are at 1350mm..... The electrician said he doesn't know why Carlisle put them at that height. We obviously had a choice though and didn't pick up on it. 1100mm people - check your plans. Anyway the electrician told another story of this one. This whole is to be re-plastered. He had to put the powerpoint in the cupboard as it's too close to the bath. Happy with that! I asked if he could lower one on the left (not in photo). He was great, he pulled it off and checked there was enough wire and there was - he could line it up with the bottom of the tiles. I said I would ring our SS and ask. I did. I returned later in the day as the electrician wanted some information on the 20amp isolator switches for future air conditioners (don't worry, I don't always harass the tradies!!) and he was told by the SS not to move them.... He must have been in a bad mood! It will be interesting to see what he says in the next few days about it! 

The electricians were hoping to have the house powered up by the end of today. But still needed to return for another day when the materials they need arrive.