Tuesday, 9 December 2014

Queensland Spotted Gum Hardwood Floor, Poly Gloss Finsih

I wish I was writing this post under different circumstances. We must have done something to insult the universe because we are being seriously punished at the moment. I will write a longer post next regarding this but it is with utter dismay and with the heaviest of hearts that I say that our stunning Spotted Gum flooring has been destroyed. It has all happened in the last 2 days and we are still in the process of going through it all but a brand new, yet defective dishwasher has slowly leaked water under our flooring for the past 2 weeks (unbeknownst to us). It has completely destroyed the floor, which will all need to be ripped up. It flooded through 2 rooms into the study and saturated the carpet there. Fischer and Paykel had their head guy come out and they found a broken pipe inside. We are completely devastated and its going to be a long journey to get back to where we are now. Our painter just finished filling and painting the skirting boards last week and we were finally ready to set all our furniture out. Instead we will soon need to begin packing again. 

Here is the flooring prior to this week (we only had 1 week of them). It turned out better than we had imagined and we could not have been happier with the final result. It was stunning.

Harwood timber flooring - QLD Spotted Gum 80 x 14mm select/standard mix
We deleted flooring in our Carlisle contract (to entry, hall, meals, kitchen and lounge) and then had our own company install the floors.

Flooring Timeline
  • 31st October - Handover - got keys
  • 3rd November - Flooring laid - took 1 week to lay
  • We moved into the house (partly) on 7th November - floors were not sanded or polished
  • Flooring then sat to allow them to acclimatise to the temperature and ensure minimal movement (as they came from Queensland) - nearly 2 weeks
  • 19th November - we moved out and floors were sanded and polished. After polishing we couldn't move back for an extra 3 days to allow time for it to dry and set (also highly toxic)
  • We moved back into the house on the 24th November
  • (See now why I haven't had many posts!!!)
  • We have been in the house just over 2 weeks....
Flooring Process
  • Concrete scraped and cleaned
  • Protective plastic laid
  • 12mm layer of ply - screwed to the slab (what appeared to be 1000 screws!)
  • QLD Spotted Gum timber glued and secret nailed
  • Sanded and polished with 3 coats of solvent poly gloss finish
Protective Plastic Goes Down
 
Ply is Laid
 
 
 
Timber Gets Delivered!! It was soooo exciting seeing the timber. It gave us a good idea of the colour and what the end result would look like (this photo is in the garage under fluorescent lights).We were so excited by the colour variation and the feature to the timber. Timber really is an absolutely beautiful product.
 
More Natural Light
 
Here we Go!!! Goose bumps when we saw the first parts down!
 
The Next Night
So much completed in a day! These photos are under light at night time
 
While the floorers laid the floors during the night. I went back to the house at night and painted all the skirting boards! Enamel paint fumes in a garage send you a little crazy after a while!!
*Because our flooring was laid after hand-over and did not want quad on the floor under any circumstances, we had Carlisle leave the skirting boards off to all of the ground floor. They left us all the skirting boards in the packets and the paint to paint them. It was a bit painful at the time to try and get them done but the end result was worth it all. To avoid quad around the kitchen the floorer used caulking. Its a timber matched silicone that fills in the small gap needed to allow for movement.
 
Finished laying in the kitchen and lounge
*This is not yet sanded or polished
 
Close Up
It has those beautiful browns, reds, and ash colours
 
More Photos - not yet sanded or polished
 
Variation of Colour is Amazing!!
 
 
 
HERE IT IS - QLD SPOTTED GUM WITH POLY GLOSS: FINISHED!!!
Looking down the hall
 
So happy with the colour match of the timber staircase; Walnut
 
 
Entry to Study and Theatre carpets - Cat3 Takarra Ridge
 
 
 
 
 
 
 

 
 
 
 
 

Sunday, 5 October 2014

Deluxe Staircase Stained Walnut

Our staircase has had it's staining done!! They are not yet finished. The risers still need further coats of white paint (Dulux Lexicon Quarter) - stairs are stained in 'Cabot's Walnut Stain'(We're not sure if the staining/lacquer is finished yet). There are parts that still need a tidy up. They look really different! I was kind of used to the way they looked in their raw state! It's great to see the colour and with the doors in the same stain, they are tying in really nicely. We had a look at a photo of our flooring that will go down after handover (QLD Spotted Gum) and we think the colours in the timber will match well. Just hoping that they both do each other justice in their own right! 

Stained in Walnut - and lovely and dusty...

Not the worlds best photography - only had my phone

Halfway - Looking Down



Stainless Steel Balusters with Double Handrail

Matching Front Doors - Stained in Rich Walnut

Similar Colour of Flooring (hopefully) - QLD Spotted Gum


Monday, 29 September 2014

Our Timber Flooring Process

As I have mentioned before, we are having our timber flooring done post handover. Our flooring company have been great to deal with and have been very understanding and accommodating with our difficulty of locking in a date. We have had to move and change the dates 4 times so far. We now have it locked in again in three and a half weeks. Our SS was so confident it would be fine for the dates (and some of those dates have passed us already - by weeks!). I'm feeling very nervous about it now as we have just under 4 weeks until we have to be out of our rental property. That means the house needs to be done and the flooring finished in that time..... It's not going to happen! Looks like we will have to put everything in storage for a few weeks - what a pain!!!!!! Anyway, we also found out something with the flooring that we didn't know or hadn't anticipated;

The flooring will be laid and take approximately 3 to 4 days to lay.
As the flooring is Queensland Spotted Gum and the temperature and humidity levels are very different here in Victoria - the timber will then have humidity testing over approximately 3 weeks and when they are happy with the results it will then be sanded and polished. This process takes approximately 3 days and after those 3 days we will not be able to go into the house for 48 hours minimum. Which means - for about a month we wont really be able to set our furniture up on the flooring (or we will but then have to dismantle everything). We will also have to be out of the house basically for the week! It's going to be worth the wait but getting the house set out perfectly (as everyone wants when they first move in) is going to take a little longer than the first weekend!!!