Sunday, 5 October 2014

Shower Screen, Taps Changed, Movement with the Fire.

Went past the house over the weekend as my sister has just moved back from WA. We were going to peek through the windows and have a look but we were lucky enough to turn up when the shower screen was being installed in the ensuite; so we ducked in for a quick peek around! A few more jobs ticked off the list!

Ensuite Shower Screen Installed

The Correct Bath/Spa Tap - Vito Bertoni Taya

Upstairs Bath Installed

The Correct Bath Tap - Vito Bertoni Taya

Top Edge of the Tiles Painted...
It's not finished yet, but the top edge of the tiles has been painted. I thought it was a bit odd at first but the more I thought about it the more it grew on me! The tiles at the house we are renting at the moment catch the dust really harshly as they are not smooth - painting may eliminate this. We looked at the display images as we had never noticed it before and sure enough they are painted - it's funny the things you never notice!

The Lock on Master Bedroom Double Door
Our ceilings are 2740mm high and little ol' me cannot reach this lock!!! Think I might need to buy a step ladder!!

Colourbond Capping on the External Fireplace Brickwork
Work on the fireplace has started!!






Monday, 29 September 2014

Balcony Tiles, Deluxe Staircase Staining and More Jobs Off the List!

It was great to get into the house yesterday and see that not only was the balcony tiled, but it had also been grouted! 

Tile - Lifestyle Charcoal Textured 400 x 400 (standard)
Grout - Charred Ash (should be darker looking than it appears but it hasn't been cleaned yet)



Paining works continued yesterday (and again today). The painters were adding silicone along the weatherboards and doing some other exterior paint touch ups. The front doors had their second coat of stain and we are so excited to know that the stain on the stairs has started!!!!!

Front Doors - Cabots Rich Walnut

Stairs Cleaned and Ready For Staining Today


Staining Began on the Staircase Handrail Yesterday

More Tiling Works
Now that the spa bath has been installed, the tiles on the wall (back left) and the front (centre) tile have been completed - they haven't been grouted yet 

With the window in the shower finally in, the tiles were able to be finished 

An extra row of tiles has also been added to the bathroom shower - we think this is due to the height of the showerhead

Theatre Room Reveals Replaced
One was replaced last week and the remaining ones have since been done - yay!

The ensuite bath tap has the incorrect tap so when we go in yesterday and went upstairs it was interesting to see that the bath tap is different, but also wrong!!
Incorrect Tap!


The painters have been using one of the back taps and it is now constantly dripping - note to self! 

Need to check the height of our timber flooring as this part of the wall looks like it might need fixing as it will still be exposed

Portable Scaffold Delivery
We assume this is in readiness for rendering the facade and the tiles 

Facade Tiles
Eco Alabaster Grigio Lappato  

Sunday, 28 September 2014

3 Steps Forward, 2 Steps Back.

At the moment if feels like we are taking a few steps forward, only to find other things that need to be done or followed up that takes us backwards! Last week was a really quiet week. Most of what our SS told us would be done, wasn't and things that have been done have either only half been done or are now affecting other things that need to be done.

Termite Protection is now Complete! 
Tick that one off the list!

On Friday the plumbers were there connecting all the downpipes to the drainage points. This is great, except that the downpipes on the facade and sides have yet to have the coloured render applied....... The downpipes were lengthened earlier in the week and they thoughtfully only tacked the brackets onto these areas as it was obvious they would need to be taken off. A week goes by (without renderers) and they need to connect them into the pipework below and now they seem somewhat permanent... Wonder what will happen here (they will be coming off!!!) 


It's great to have the downpipes on so that the rain isn't pooling around the sides of the house. They were put on just in time for the warm weather!

Lots of pipes and unknown drainage points!

This one is out the front and has a different capping to the others - sure to find out more during the week.

This point looks like drainage to clear off excess surface water. It is oh so close to where the concrete for the driveway will be. Maybe you concrete it in to the area to help runoff? 

You can see it's position on the edge of the crossover

The painters were there today. When we went past they were staining the trim (architrave) of the front doors. We thought the stairs may also have been done (as our SS said it may be done last week). The front door architraves were done, but not the actual doors, the alfreco ceiling was painted, but not the small eves at the side of the alfresco, the garage wall that was re-plastered was painted, but not the walls inside that had been patched..... 2 steps forward, 1 step back..... 

Alfresco Ceiling

Garage Wall Painted

Garage Eave Painted

Upstairs Bath Delivered (sitting in the study here)

Tapware on Ensuite Spa Bath
except it's the wrong spout.... (It actually hasn't been connected properly so we think they are aware this is the wrong one.  

I took this photo today because I absolutely love these doors! Sometimes you don't want to lose sight of the amazing things by getting bogged down in the things that no doubt will work themselves out in the end! Looking forward to many dinner parties looking through these babies!! 



Tuesday, 2 September 2014

Bits and Pieces

It's been hard to write a post this week as I've been waiting for a stage to be completed. Instead, we have had lots of bits and pieces being done, nothing really finished. Progress is progress though so no complaints! The weather is again, being very unkind this week which isn't helping. Spring weather; please flourish! 

Work in the past week has included;

  • Grouting to tiles
  • Tap-ware installed
  • Finishing unfinished brickwork
  • Scaffolding removed
  • Balcony rails installed




Grouting Done and Toilet In!


Breaks my heart seeing the tiles like this.......
And someone walked on the wall because......

Bathroom and Ensuite Mixers in
Tapware - Phoenix Rush Basin Mixer - Upgrade

Bathroom Shower-head and Mixer installed
Showerhead - Phoenix Lexi - Double Shower on Rail (Upgrade)
Tapware - Phoenix Rush Shower Mixer (Upgrade)

Same in the Ensuite
(still waiting for the correct window - so tiling can finish)

Kitchen Tap!
Tapware - Phoenix Argo Square (Upgrade)

Butlers Tap
Tapware - Phoenix Argo Square (Upgrade)

Kitchen Wall Finished (bricked)

Dining Sill Finished

Hot and Cold Water Points Connected
(for BBQ setup post-hand over)
 

Scaffolding Removed 
(Pre-render still incomplete as well as brick work over balcony door)
Can really start to see the house without the scaffold there.


And.... very exciting
The Balcony Rails Have Started!

Balcony - Including the great angle on the down-pipe.....